HEDNO’s Second Announcement, as non-Interconnected Islands Operator, on the procedure of Application Forms for the Connection of Small-scale Wind Plants (its cancellation).
17th of December 2013
Following the elements foreseen in the document of the Ministry of Environment, Energy and Climate Change with protocol no ΥΑΠΕ/Φ18/3392/23169/13.12.2013, the procedure announced on 21.11.2013 referring to the submission of requests for small-scale wind plants with capacity ≤50 kW in the non-Interconnected islands is cancelled until the issuance of the relevant Ministerial Decision for the approval of the Special Program for small wind generators installation according to the enabling provision of the L.4203/2013 (article 4, paragraph 1).
After the issuance of the relevant Ministerial Decision, there will be future Announcement released by the Non-Interconnected Islands Operator.