CIPORT
CIPORT - Cold ironing in the Port of Piraeus – Taking the Final Step
Period: 8/2021 - 11/2023
Project Coordinator: Piraeus Port Authority
Project website: olp.gr - CIPORT
Partners:
PORT AUTHORITY OF PIRAEUS ( PPA ) – Coordinator
HEDNO - Hellenic Electricity Distribution Network Operator SA
NATIONAL TECHNICAL UNIVERSITY OF ATHENS ( NTUA)
PROT.A.S.I.S.- Protection Applications and Studies Industrial Services S.A.
HYDRUS Engineering SA
GATES. - Global Transport and Engineering Systems Ltd
The project's Target:
- Environmental studies required for the installation and operation ofthe OPS system;
- A Cost-Benefit Analysis;
- A study for the appropriate commercial model for the electricity supply to cruise vessels as well as a calculation ofthe appropriate pricing methodology, and;
- Tender documents for the subsequent works.
The completion of the Action will lead to the launch of the tender for the subsequent works after the Action’s end.