Alternative Fuel Implementation in Port of Igoumenitsa

Period: 8/2020 - 11/2022

Project Coordinator: Igoumenitsa Port Authority

Project website: https://www.alfion.gr/

The project is funded by the EU under the Connecting Europe Facility (CEF), the EU's funding framework for infrastructure investment across the Union under grant agreement No M2019/2107783

 

Partners:

PORT AUTHORITY OF IGOUMENITSA ( OLIG ) – Coordinator

HEDNO - Hellenic Electricity Distribution Network Operator SA

NATIONAL TECHNICAL UNIVERSITY OF ATHENS ( NTUA)

PROT.A.S.I.S.- Protection Applications and Studies Industrial Services S.A.

HYDRUS Engineering SA

GATES. - Global Transport and Engineering Systems Ltd

 

The project's Target:

Design of preliminary studies (FEED) regarding the infrastructures inside the Port for OPS/Cold ironing systems, alternative fuels, energy management and integration with existing structures. Also, implementation of a techno-economic analysis (CBA) with the aim of further funding for the implementation of the studies