HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Dual Zone Reduced Electricity Rate System
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
    • Smart Meters
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Dual Zone Reduced Electricity Rate System
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
    • Smart Meters
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
  1. StartPage
  2. PVs and other RES
  3. Connections of the Renewable Energy Resources (RES) plants
  4. Possibilities of absorbing RES stations capacity in the Network
  5. Brief data of RES plants

Brief data of RES plants

Download the .pdf file

PVs and other RES

  • Remote monitoring and supervisory control
  • RES Energy Production on a new App
  • Online Platform for the Submission of Applications for RES and CHP stations
  • Details on the maximum and remaining voltage limits for PV stations in rural areas
  • Special 1% RES Fee
  • Application - Possibilities for absorbing RES station capacities per region in the Interconnected Network
  • RES & CHP stations by self-producers who have entered Net Metering or Virtual Net Metering
  • Special Program for PVs in roofs (Ministerial Decision 12323/ΓΓ75/09 (GG 1079/Β/4.6.2009))
  • Special Program PV system installation at residential properties (Ministerial Decision ΥΠΕΝ/ΔΑΠΕΕΚ/121501/5015 (GG 6351/Β/30.12.2021)
  • Connections of the Renewable Energy Resources (RES) plants
    • Announcements
    • Printing Forms of Applications
    • Regulatory Framework
    • Possibilities of absorbing RES stations capacity in the Network
      • PPC proposal to RAE for determining the possibility of absorbing the dispersed production in the Distribution Network
      • Possibilities for the connection of RES plants per region
      • Data of H.V/M.V Substations and RES plants per region
      • Brief presentation of results
      • Brief data of RES plants
    • Archives of Applications under HEDNO's competence
  • Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator
  • If you are a >400kw RES/CHP producer, please note that:

HEDNO S.A.

20 Perraivou & 5 Kallirrois str.
117 43 Athens

E-mail: infodeddie@deddie.gr
Fax :+30 21440 50205

GEMI No: 003089701000
General Commercial Registry

Useful links
  • YPEKA
  • RAE
  • HELLENIC ENERGY EXCHANGE S.A.
  • DEI
  • ADMIE
  • EUROPEAN COMMISSION
  • Eurelectric
  • EDSO
Useful
  • Website terms of use
  • Body temperature measurement system
  • Cookie Policy
  • Information Security
  • Video Surveillance
  • Information about Recorded Calls
Useful
  • Privacy Policy for Provisional & Final Contractors
  • Privacy Policy and information for the users of the Hellenic Electricity Distribution Network

Follow us

  • linkedin
  • youtube
  • © 2025
  • Sitemap
  • Terms of Use and Safety
  • Designed & developed by
    EXUS