HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Residential Off-Peak Tariff
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Financial Data
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
  1. StartPage
  2. PVs and other RES
  3. Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator

Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator

  • Updated IPTO and HEDNO list on the electricity capacity margin in the Peleoponnese (19.12.2019)
  • Updated IPTO and HEDNO list on the electricity capacity margin in the Peloponnese (06.11.2019)
  • Updated IPTO and HEDNO list on the electricity capacity margin in the Peleponnese (21.02.2019)
  • Updated IPTO and HEDNO list on the electricity capacity margin in the Peloponnese (25.08.2017)
  • Archive of application forms for RES stations to the Network Management Department after the L.3851
  • Archive of individuals-companies application forms for PV plants up to 100kW capacity after the L.3851
  • Archive of application forms submitted to the Network Management Department for PV plants of more than 100kW and up to 150kW based on RAE exclusion decision
  • Archive of application forms with capacity up to 100 kW according to RAE decision of exemption or exclusion
  • Archive of applications for the Special Program PV systems
  • Archive of applications for PV plants submitted by farmers
  • Archive of application forms to the Department of Peloponnese- Epirus Region for PV plants of more than 100kW capacity after the L.3851
  • Archive of application forms for PV systems of the Special List with capacity up to 1MW
  • Archive of application forms for RES stations of the RAE list

PVs and other RES

  • Online Platform for the Submission of Applications for RES and CHP stations
  • Details on the maximum and remaining voltage limits for PV stations in rural areas
  • Special 1% RES Fee
  • Application - Possibilities for absorbing RES station capacities per region in the Interconnected Network
  • RES & CHP stations by self-producers who have entered Net Metering or Virtual Net Metering
  • Special Program for PVs in roofs (Ministerial Decision 12323/ΓΓ75/09 (GG 1079/Β/4.6.2009))
  • Special Program PV system installation at residential properties (Ministerial Decision ΥΠΕΝ/ΔΑΠΕΕΚ/121501/5015 (GG 6351/Β/30.12.2021)
  • Connections of the Renewable Energy Resources (RES) plants
  • Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator

HEDNO S.A.

20 Perraivou & 5 Kallirrois str.
117 43 Athens

E-mail: infodeddie@deddie.gr
Fax :+30 21440 50205

GEMI No: 003089701000
General Commercial Registry

Useful links
  • YPEKA
  • RAE
  • HELLENIC ENERGY EXCHANGE S.A.
  • DEI
  • ADMIE
  • EUROPEAN COMMISSION
  • Eurelectric
  • EDSO
Useful
  • Website terms of use
  • Body temperature measurement system
  • Cookie Policy
  • Information Security
  • Video Surveillance
Useful
  • Privacy Policy for Provisional & Final Contractors

Follow us

  • linkedin
  • youtube
  • © 2023
  • Sitemap
  • Terms of Use and Safety
  • Designed & developed by
    EXUS