HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Dual Zone Reduced Electricity Rate System
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
    • Smart Meters
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Dual Zone Reduced Electricity Rate System
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
    • Smart Meters
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
  1. StartPage
  2. PVs and other RES
  3. Connections of the Renewable Energy Resources (RES) plants
  4. Archives of Applications under HEDNO's competence
  5. Status of RES & CHP station connection applications pending for evaluation (April 2025)

Status of RES & CHP station connection applications pending for evaluation (April 2025)

  • Clarifications on the management of RES & CHP station connection applications pending for evaluation
  • Applications pending for evaluation by the Macedonia-Thrace Region Department
  • Applications pending for evaluation by the Central Greece Region Department
  • Applications pending for evaluation by the Peloponnese - Epirus Region Department
  • Applications pending for evaluation by the Attica Region Department
  • Applications pending for evaluation by the Islands Region Department

PVs and other RES

  • Remote monitoring and supervisory control
  • RES Energy Production on a new App
  • Online Platform for the Submission of Applications for RES and CHP stations
  • Details on the maximum and remaining voltage limits for PV stations in rural areas
  • Special 1% RES Fee
  • Application - Possibilities for absorbing RES station capacities per region in the Interconnected Network
  • RES & CHP stations by self-producers who have entered Net Metering or Virtual Net Metering
  • Special Program for PVs in roofs (Ministerial Decision 12323/ΓΓ75/09 (GG 1079/Β/4.6.2009))
  • Special Program PV system installation at residential properties (Ministerial Decision ΥΠΕΝ/ΔΑΠΕΕΚ/121501/5015 (GG 6351/Β/30.12.2021)
  • Connections of the Renewable Energy Resources (RES) plants
    • Announcements
    • Printing Forms of Applications
    • Regulatory Framework
    • Possibilities of absorbing RES stations capacity in the Network
    • Archives of Applications under HEDNO's competence
      • Status of RES & CHP station connection applications pending for evaluation (May 2025)
      • Connection Applications for RES & CHP stations under the competence of HEDNO in Mainland Greece and the Interconnected Island (April 2025)
      • Status of RES & CHP station connection applications pending for evaluation (April 2025)
        • Clarifications on the management of RES & CHP station connection applications pending for evaluation
        • Applications pending for evaluation by the Macedonia-Thrace Region Department
        • Applications pending for evaluation by the Central Greece Region Department
        • Applications pending for evaluation by the Peloponnese - Epirus Region Department
        • Applications pending for evaluation by the Attica Region Department
        • Applications pending for evaluation by the Islands Region Department
      • Status of RES & CHP station connection applications pending for evaluation (March 2025)
      • Status of RES & CHP station connection applications pending for evaluation (February 2025)
      • Status of RES & CHP station connection applications pending for evaluation (January 2025)
      • Status of RES & CHP station connection applications pending for evaluation (December 2024)
      • Status of RES & CHP station connection applications pending for evaluation (November 2024)
      • Status of RES & CHP station connection applications pending for evaluation (October 2024)
      • Status of RES & CHP station connection applications pending for evaluation (September 2024)
      • Status of RES & CHP station connection applications pending for evaluation (August 2024)
      • Status of RES & CHP station connection applications pending for evaluation (July 2024)
      • Status of RES & CHP station connection applications pending for evaluation (June 2024)
      • Status of RES & CHP station connection applications pending for evaluation (May 2024)
      • Status of RES & CHP station connection applications pending for evaluation (April 2024)
      • Status of RES & CHP station connection applications pending for evaluation (March 2024)
      • Connection Applications for RES & CHP stations under the competence of HEDNO in Mainland Greece and the Interconnected Island (February 2024)
      • Status of RES & CHP station connection applications pending for evaluation (February 2024)
      • Status of RES & CHP station connection applications pending for evaluation (January 2024)
      • Connection Applications for RES & CHP stations under the competence of HEDNO in Mainland Greece and the Interconnected Island (December 2023)
      • Status of RES & CHP station connection applications pending for evaluation (December 2023)
      • Status of RES & CHP station connection applications pending for evaluation (November 2023)
      • Status of RES & CHP station connection applications pending for evaluation (October 2023)
      • Status of RES & CHP station connection applications pending for evaluation (September 2023)
      • Connection Applications for RES & CHP stations under the competence of HEDNO in Mainland Greece and the Interconnected Island (August 2023)
      • Status of RES & CHP station connection applications pending for evaluation (August 2023)
      • Status of RES & CHP station connection applications pending for evaluation (July 2023)
      • Status of RES & CHP station connection applications pending for evaluation (June 2023)
      • Status of RES & CHP station connection applications pending for evaluation (May 2023)
      • Status of RES & CHP station connection applications pending for evaluation (April 2023)
      • Status of RES & CHP station connection applications pending for evaluation (March 2023)
      • Status of RES & CHP station connection applications pending for evaluation (February 2023)
      • Status of RES & CHP station connection applications pending for evaluation (January 2023)
      • Status of RES & CHP station connection applications pending for evaluation (December 2022)
      • Status of RES & CHP station connection applications pending for evaluation (November 2022)
      • Connection Applications for RES & CHP stations under the competence of HEDNO in Mainland Greece and the Interconnected Island (November 2022)
      • Status of RES & CHP station connection applications pending for evaluation (October 2022)
      • Status of RES & CHP station connection applications pending for evaluation (September 2022)
      • Status of RES & CHP station connection applications pending for evaluation (August 2022)
      • Status of RES & CHP station connection applications pending for evaluation (July 2022)
      • Status of RES & CHP station connection applications pending for evaluation (June 2022)
      • Connection Applications for RES & CHP stations under the competence of HEDNO in Mainland Greece and the Interconnected Island (May 2022)
      • Status of RES & CHP station connection applications pending for evaluation (May 2022)
      • Status of RES & CHP station connection applications pending for evaluation (April 2022)
      • Status of RES & CHP station connection applications pending for evaluation (March 2022)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (February 2022)
      • Progress on pending review requests regarding RES & CHP connection (February 2022)
      • Progress on pending review requests regarding RES & CHP connection (January 2022)
      • Progress on pending review requests regarding RES & CHP connection (December 2021)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (November 2021)
      • Progress on pending review requests regarding RES & CHP connection (November 2021)
      • Progress on pending review requests regarding RES & CHP connection (October 2021)
      • Progress on pending review requests regarding RES & CHP connection (September 2021)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (August 2021)
      • Progress on pending review requests regarding RES & CHP connection (August 2021)
      • Progress on pending review requests regarding RES & CHP connection (July 2021)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (June 2021)
      • Progress on pending review requests regarding RES & CHP connection (June 2021)
      • Applications for PV stations with completeness up until 31.12.2020
      • Progress on pending review requests regarding RES & CHP connection (May 2021)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (April 2021)
      • Progress on pending review requests regarding RES & CHP connection (April 2021)
      • Progress on pending review requests regarding RES & CHP connection (March 2021)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (February 2021)
      • Progress on pending review requests regarding RES & CHP connection (February 2021)
      • Readiness Statements & Sample Checks for RES & CHP stations (January 2021)
      • Progress on pending review requests regarding RES & CHP connection (January 2021)
      • Examination process of pending RES & CHP connection requests (July 2020)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (July 2020)
      • Examination process of pending RES & CHP connection requests (April 2020)
      • Examination process of pending RES & CHP connection requests (January 2020)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (January 2020)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (September 2019)
      • Examination process of pending RES & CHP connection requests (September 2019)
      • Examination process of pending RES & CHP connection requests (May 2019)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (April 2019)
      • Examination process of pending RES & CHP connection requests (December 2018)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (December 2018)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (August 2018)
      • Examination process of pending RES & CHP connection requests (August 2018)
      • Archive of application forms after the L. 3851/2010 (June 2012)
      • Archive of application forms after the L. 3851/2010 (January 2012)
      • Examination process of pending RES & CHP connection requests (April 2018)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (April 2018)
      • Examination process of pending RES & CHP connection requests (November 2017)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (November 2017)
      • Examination process of pending RES & CHP connection requests (June 2017)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (June 2017)
      • Examination process of pending RES & CHP connection requests (February 2017)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (February 2017)
      • Examination process of pending RES & CHP connection requests (October 2016)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (October 2016)
      • Examination process of pending RES & CHP connection requests (July 2016)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (July 2016)
      • Examination process of pending RES & CHP connection requests (April 2016)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (April 2016)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (January 2016)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (January 2016)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (October 2015)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (October 2015)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (April 2015)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (October 2014)
      • Connection applications of RES & CHP stations belonging to the competence of HEDNO (October 2014)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (September 2014)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (June 2014)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (March 2014)
      • Assessment progress on pending requests for connection of RES Plants & High Performance CHP (January 2014)
      • Application forms for connection of RES plants & High Performance CHP with permit, under HEDNO's competence according to L.4152/2013
      • Archive of application forms after the L. 3851/2010 (July 2013)
      • Archive of application forms after the L. 3851/2010 (March 2013)
      • Archive of application forms after the L. 3851/2010 (September 2012)
  • Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator
  • If you are a >400kw RES/CHP producer, please note that:

Contact us

Stay in touch

HEDNO S.A.

20 Perraivou & 5 Kallirrois str.
117 43 Athens

E-mail: infodeddie@deddie.gr
Fax :+30 21440 50205

GEMI No: 003089701000
General Commercial Registry

Useful links
  • YPEKA
  • RAE
  • HELLENIC ENERGY EXCHANGE S.A.
  • DEI
  • ADMIE
  • EUROPEAN COMMISSION
  • Eurelectric
  • EDSO
Useful
  • Website terms of use
  • Body temperature measurement system
  • Cookie Policy
  • Information Security
  • Video Surveillance
  • Information about Recorded Calls
Useful
  • Privacy Policy for Provisional & Final Contractors
  • Privacy Policy and information for the users of the Hellenic Electricity Distribution Network

Follow us

  • linkedin
  • youtube
  • © 2025
  • Sitemap
  • Terms of Use and Safety
  • Designed & developed by
    EXUS