HEDNO
Menu
HEDNO
Company Profile
Electricity Distribution Network
Health and Safety
Sustainable Development
Tenders
Publications
Employment
Services
Connection with the network
Residential Off-Peak Tariff
Metering
Power Cuts - Planned Power Interruptions
Special Tariffs
Exemption from Municipal Charges for properties without not supplied with electricity
Smart Meters
Media Center
News and Announcements
Press Releases
Useful News
Electricity theft
Video & Photo Gallery
Corporate Brochures
Strategy - Modernization
Strategic Projects
Modernization
Innovation
EL
StartPage
PVs and other RES
Online Platform for the Submission of Applications for RES and CHP stations
Electronic submission of applications for PV stations of Self-Producers with Net Metering with installed capacity up to 10.8 kW and maximum output capacity of up to 10 kW
Electronic submission of applications for PV stations of Self-Producers with Net Metering with installed capacity up to 10.8 kW and maximum output capacity of up to 10 kW
Login to the platform
Manual of the platform
PVs and other RES
Online Platform for the Submission of Applications for RES and CHP stations
Online Submission of Application for RES and CHP stations
Electronic submission of applications for PV stations of Self-Producers with Net Metering with installed capacity up to 10.8 kW and maximum output capacity of up to 10 kW
Login to the platform
Manual of the platform
Clarifications on the data and documents submitted as part of the online connection applications for RES or CHP stations
Announcements
Results of “Agricultural PVs” Program
Details on the maximum and remaining voltage limits for PV stations in rural areas
Special 1% RES Fee
Application - Possibilities for absorbing RES station capacities per region in the Interconnected Network
RES & CHP stations by self-producers who have entered Net Metering or Virtual Net Metering
Special Program for PVs in roofs (Ministerial Decision 12323/ΓΓ75/09 (GG 1079/Β/4.6.2009))
Special Program PV system installation at residential properties (Ministerial Decision ΥΠΕΝ/ΔΑΠΕΕΚ/121501/5015 (GG 6351/Β/30.12.2021)
Connections of the Renewable Energy Resources (RES) plants
Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator
If you are a >400kw RES/CHP producer, please note that: