HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Dual Zone Reduced Electricity Rate System
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
    • Smart Meters
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
HEDNO
Menu
  • HEDNO
    • Company Profile
    • Electricity Distribution Network
    • Health and Safety
    • Sustainable Development
    • Tenders
    • Publications
    • Employment
  • Services
    • Connection with the network
    • Dual Zone Reduced Electricity Rate System
    • Metering
    • Power Cuts - Planned Power Interruptions
    • Special Tariffs
    • Exemption from Municipal Charges for properties without not supplied with electricity
    • Smart Meters
  • Media Center
    • News and Announcements
    • Press Releases
    • Useful News
    • Electricity theft
    • Video & Photo Gallery
    • Corporate Brochures
  • Strategy - Modernization
    • Strategic Projects
    • Modernization
    • Innovation
EL
  1. StartPage
  2. PVs and other RES
  3. Online Platform for the Submission of Applications for RES and CHP stations
  4. Announcements

Announcements

  • Announcement regarding the Electronic Application Platform for RES and CHP stations
  • Announcement on the suspension of acceptance of 10 kW net metering applications
  • Announcement on the use of the pvstegi platform for the registration of vendors and the uploading of documents for self-producers with up to 10,8 Kw PV connection applications with Net Metering that are eligible for a grant
  • Announcement 1st amendment of the Joint Ministerial Decision "PVs in Roof" and commencement of payment of certified subsidized amounts with eligible applications for connection of PV with Net Metering of power up to 10. 8 kW

PVs and other RES

  • Remote monitoring and supervisory control
  • RES Energy Production on a new App
  • Online Platform for the Submission of Applications for RES and CHP stations
    • Online Submission of Application for RES and CHP stations
    • Electronic submission of applications for PV stations of Self-Producers with Net Metering with installed capacity up to 10.8 kW and maximum output capacity of up to 10 kW
    • Clarifications on the data and documents submitted as part of the online connection applications for RES or CHP stations
    • Announcements
      • Announcement regarding the Electronic Application Platform for RES and CHP stations
      • Announcement on the suspension of acceptance of 10 kW net metering applications
      • Announcement on the use of the pvstegi platform for the registration of vendors and the uploading of documents for self-producers with up to 10,8 Kw PV connection applications with Net Metering that are eligible for a grant
      • Announcement 1st amendment of the Joint Ministerial Decision "PVs in Roof" and commencement of payment of certified subsidized amounts with eligible applications for connection of PV with Net Metering of power up to 10. 8 kW
    • Results of “Agricultural PVs” Program
  • Details on the maximum and remaining voltage limits for PV stations in rural areas
  • Special 1% RES Fee
  • Application - Possibilities for absorbing RES station capacities per region in the Interconnected Network
  • RES & CHP stations by self-producers who have entered Net Metering or Virtual Net Metering
  • Special Program for PVs in roofs (Ministerial Decision 12323/ΓΓ75/09 (GG 1079/Β/4.6.2009))
  • Special Program PV system installation at residential properties (Ministerial Decision ΥΠΕΝ/ΔΑΠΕΕΚ/121501/5015 (GG 6351/Β/30.12.2021)
  • Connections of the Renewable Energy Resources (RES) plants
  • Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator
  • If you are a >400kw RES/CHP producer, please note that:

Contact us

Stay in touch

HEDNO S.A.

20 Perraivou & 5 Kallirrois str.
117 43 Athens

E-mail: infodeddie@deddie.gr
Fax :+30 21440 50205

GEMI No: 003089701000
General Commercial Registry

Useful links
  • YPEKA
  • RAE
  • HELLENIC ENERGY EXCHANGE S.A.
  • DEI
  • ADMIE
  • EUROPEAN COMMISSION
  • Eurelectric
  • EDSO
Useful
  • Website terms of use
  • Body temperature measurement system
  • Cookie Policy
  • Information Security
  • Video Surveillance
  • Information about Recorded Calls
Useful
  • Privacy Policy for Provisional & Final Contractors
  • Privacy Policy and information for the users of the Hellenic Electricity Distribution Network

Follow us

  • linkedin
  • youtube
  • © 2025
  • Sitemap
  • Terms of Use and Safety
  • Designed & developed by
    EXUS