PVs and other RES
- Remote monitoring and supervisory control
- RES Energy Production on a new App
- Online Platform for the Submission of Applications for RES and CHP stations
- Details on the maximum and remaining voltage limits for PV stations in rural areas
- Special 1% RES Fee
- Application - Possibilities for absorbing RES station capacities per region in the Interconnected Network
- RES & CHP stations by self-producers who have entered Net Metering or Virtual Net Metering
- Special Program for PVs in roofs (Ministerial Decision 12323/ΓΓ75/09 (GG 1079/Β/4.6.2009))
- Special Program PV system installation at residential properties (Ministerial Decision ΥΠΕΝ/ΔΑΠΕΕΚ/121501/5015 (GG 6351/Β/30.12.2021)
- Connections of the Renewable Energy Resources (RES) plants
- Elements related to the connection status of RES units to the Peloponnese network under the competence of the Network Operator
- If you are a >400kw RES/CHP producer, please note that: