Connections of Renewable Energy Sources Plants
-
08/11/2024
Licensing progress data for Solar Thermal Stations at NIIs (October 2024) -
08/11/2024
Licensing progress data for Hybrid Stations at NIIs (October 2024) -
08/11/2024
Licensing progress data for CHPs at NIIs (October 2024) -
08/11/2024
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (October 2024) -
08/11/2024
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (October 2024) -
08/11/2024
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (October 2024) -
08/11/2024
Applications record for small Wind Farms at NIIs (October 2024) -
08/11/2024
File with Applications for Wind Farms at the Non-Interconnected Islands (October 2024) -
16/09/2024
File with Applications for Wind Farms at the Non-Interconnected Islands (August 2024) -
16/09/2024
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (August 2024) -
16/09/2024
Applications record for small Wind Farms at NIIs (August 2024) -
16/09/2024
Licensing progress data for CHPs at NIIs (August 2024) -
16/09/2024
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (August 2024) -
16/09/2024
Licensing progress data for Solar Thermal Stations at NIIs (August 2024) -
16/09/2024
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (August 2024) -
12/07/2024
Licensing progress data for Hybrid Stations at NIIs (August 2024) -
12/07/2024
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2024) -
12/07/2024
Applications record for small Wind Farms at NIIs (June 2024) -
12/07/2024
Licensing progress data for Hybrid Stations at NIIs (June 2024) -
12/07/2024
Licensing progress data for CHPs at NIIs (June 2024) -
12/07/2024
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (June 2024) -
12/07/2024
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (June 2024) -
12/07/2024
File with Applications for Wind Farms at the Non-Interconnected Islands (June 2024) -
12/07/2024
Licensing progress data for Solar Thermal Stations at NIIs (June 2024) -
20/05/2024
File with Applications for Wind Farms at the Non-Interconnected Islands (April 2024) -
20/05/2024
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (April 2024) -
20/05/2024
Applications record for small Wind Farms at NIIs (April 2024) -
20/05/2024
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (April 2024) -
20/05/2024
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (April 2024) -
20/05/2024
Licensing progress data for CHPs at NIIs (April 2024) -
20/05/2024
Licensing progress data for Hybrid Stations at NIIs (April 2024) -
20/05/2024
Licensing progress data for Solar Thermal Stations at NIIs (April 2024) -
20/03/2024
Applications record for small Wind Farms at NIIs (February 2024) -
20/03/2024
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (February 2024) -
20/03/2024
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (February 2024) -
20/03/2024
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (February 2024) -
20/03/2024
File with Applications for Wind Farms at the Non-Interconnected Islands (February 2024) -
20/03/2024
Licensing progress data for Solar Thermal Stations at NIIs (February 2024) -
20/03/2024
Licensing progress data for Hybrid Stations at NIIs (February 2024) -
20/03/2024
Licensing progress data for CHPs at NIIs (February 2024) -
16/01/2024
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (January 2024) -
16/01/2024
File with Applications for Wind Farms at the Non-Interconnected Islands (January 2024) -
16/01/2024
Applications record for small Wind Farms at NIIs (January 2024) -
16/01/2024
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (January 2024) -
16/01/2024
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (January 2024) -
16/01/2024
Licensing progress data for Solar Thermal Stations at NIIs (January 2024) -
16/01/2024
Licensing progress data for Hybrid Stations at NIIs (January 2024) -
16/01/2024
Licensing progress data for CHPs at NIIs (January 2024) -
17/11/2023
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (November 2023) -
17/11/2023
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (November 2023) -
17/11/2023
File with Applications for Wind Farms at the Non-Interconnected Islands (November 2023) -
17/11/2023
Applications record for small Wind Farms at NIIs (November 2023) -
17/11/2023
Licensing progress data for Hybrid Stations at NIIs (November 2023) -
17/11/2023
Licensing progress data for CHPs at NIIs (November 2023) -
17/11/2023
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (November 2023) -
17/11/2023
Licensing progress data for Solar Thermal Stations at NIIs (November 2023) -
21/09/2023
Licensing progress data for Solar Thermal Stations at NIIs (September 2023) -
21/09/2023
Licensing progress data for Hybrid Stations at NIIs (September 2023) -
21/09/2023
Licensing progress data for CHPs at NIIs (September 2023) -
21/09/2023
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (September 2023) -
21/09/2023
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (September 2023) -
21/09/2023
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (September 2023) -
21/09/2023
File with Applications for Wind Farms at the Non-Interconnected Islands (September 2023) -
21/09/2023
Applications record for small Wind Farms at NIIs (September 2023) -
26/07/2023
Licensing progress data for Solar Thermal Stations at NIIs (July 2023) -
26/07/2023
Licensing progress data for Hybrid Stations at NIIs (July 2023) -
26/07/2023
Licensing progress data for CHPs at NIIs (July 2023) -
26/07/2023
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (July 2023) -
26/07/2023
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (July 2023) -
26/07/2023
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (July 2023) -
26/07/2023
File with Applications for Wind Farms at the Non-Interconnected Islands (July 2023) -
26/07/2023
Applications record for small Wind Farms at NIIs (July 2023) -
24/05/2023
Licensing progress data for Hybrid Stations at NIIs (May 2023) -
24/05/2023
Licensing progress data for Solar Thermal Stations at NIIs (May 2023) -
24/05/2023
Licensing progress data for CHPs at NIIs (May 2023) -
24/05/2023
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (May 2023) -
24/05/2023
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (May 2023) -
24/05/2023
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (May 2023) -
24/05/2023
File with Applications for Wind Farms at the Non-Interconnected Islands (May 2023) -
24/05/2023
Applications record for small Wind Farms at NIIs (May 2023) -
20/03/2023
Licensing progress data for Solar Thermal Stations at NIIs (March 2023) -
20/03/2023
Licensing progress data for Hybrid Stations at NIIs (March 2023) -
20/03/2023
Licensing progress data for CHPs at NIIs (March 2023) -
20/03/2023
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (March 2023) -
20/03/2023
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (March 2023) -
20/03/2023
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (March 2023) -
20/03/2023
File with Applications for Wind Farms at the Non-Interconnected Islands (March 2023) -
20/03/2023
Applications record for small Wind Farms at NIIs (March 2023) -
01/02/2023
Licensing progress data for Solar Thermal Stations at NIIs (January 2023) -
01/02/2023
Licensing progress data for Hybrid Stations at NIIs (January 2023) -
01/02/2023
Licensing progress data for CHPs at NIIs (January 2023) -
01/02/2023
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (January 2023) -
01/02/2023
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (January 2023) -
01/02/2023
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (January 2023) -
01/02/2023
File with Applications for Wind Farms at the Non-Interconnected Islands (January 2023) -
01/02/2023
Applications record for small Wind Farms at NIIs (January 2023) -
21/11/2022
Licensing progress data for Solar Thermal Stations at NIIs (October 2022) -
21/11/2022
Licensing progress data for Hybrid Stations at NIIs (October 2022) -
21/11/2022
Licensing progress data for CHPs at NIIs (October 2022) -
21/11/2022
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (October 2022) -
21/11/2022
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (October 2022) -
21/11/2022
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (October 2022) -
21/11/2022
File with Applications for Wind Farms at the Non-Interconnected Islands (October 2022) -
21/11/2022
Applications record for small Wind Farms at NIIs (October 2022) -
13/09/2022
Licensing progress data for Solar Thermal Stations at NIIs (August 2022) -
13/09/2022
Licensing progress data for Hybrid Stations at NIIs (August 2022) -
13/09/2022
Licensing progress data for CHPs at NIIs (August 2022) -
13/09/2022
Archive of Applications for controlled Biomass, Biogas Plants at NIIs (August 2022) -
13/09/2022
Archive of Applications for non-controlled Biomass, Biogas Plants at NIIs (August 2022) -
13/09/2022
Archive of requests for PV Stations, Special Program PV and PV net Metering at NIIs (August 2022) -
13/09/2022
Archive of Applications for Wind Farms at NIIs (August 2022) -
13/09/2022
Archive of Applications for small Wind Turbine Plants at NIIs (August 2022) -
13/07/2022
Τable of PV Capacity for the Non- Interconnected Islands (June 2022) -
13/07/2022
Licensing progress data for Solar Thermal Stations in NII (June 2022) -
13/07/2022
Licensing progress data for Hybrid Plants in NII (June 2022) -
13/07/2022
Licensing progress data for Cogeneration of Heat-High Performance in NII (June 2022) -
13/07/2022
Records of requests for Biomass, biogas or bioliquid in NII (June 2022) -
13/07/2022
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (June 2022) -
13/07/2022
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2022) -
13/07/2022
File with Applications for Wind Farms at the Non-Interconnected Islands (June 2022) -
13/07/2022
Applications record for small Wind Farms at NIIs (June 2022) -
20/06/2022
Τable of PV Capacity for the Non- Interconnected Islands (April 2022) -
20/06/2022
Licensing progress data for Solar Thermal Stations in NII (April 2022) -
20/06/2022
Licensing progress data for Hybrid Plants in NII (April 2022) -
20/06/2022
Licensing progress data for Cogeneration of Heat-High Performance in NII (April 2022) -
20/06/2022
Records of requests for Biomass, biogas or bioliquid in NII (April 2022) -
20/06/2022
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (April 2022) -
20/06/2022
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (April 2022) -
20/06/2022
File with Applications for Wind Farms at the Non-Interconnected Islands (April 2022) -
20/06/2022
Applications record for small Wind Farms at NIIs (April 2022) -
15/03/2022
Licensing progress data for Hybrid Plants in NII (February 2022) -
15/03/2022
Licensing progress data for Solar Thermal Stations in NII (February 2022) -
15/03/2022
Τable of PV Capacity for the Non- Interconnected Islands (February 2022) -
15/03/2022
Records of requests for Biomass, biogas or bioliquid in NII (February 2022) -
15/03/2022
Licensing progress data for Cogeneration of Heat-High Performance in NII (February 2022) -
15/03/2022
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (February 2022) -
15/03/2022
File with Applications for Wind Farms at the Non-Interconnected Islands (February 2022) -
15/03/2022
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (February 2022) -
15/03/2022
Applications record for small Wind Farms at NIIs (February 2022) -
28/01/2022
Τable of PV Capacity for the Non- Interconnected Islands (December 2021) -
28/01/2022
Licensing progress data for Solar Thermal Stations in NII (December 2021) -
28/01/2022
Licensing progress data for Hybrid Plants in NII (December 2021) -
28/01/2022
Licensing progress data for Cogeneration of Heat-High Performance in NII (December 2021) -
28/01/2022
Records of requests for Biomass, biogas or bioliquid in NII (December 2021) -
28/01/2022
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (December 2021) -
28/01/2022
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (December 2021) -
28/01/2022
File with Applications for Wind Farms at the Non-Interconnected Islands (December 2021) -
28/01/2022
Applications record for small Wind Farms at NIIs (December 2021) -
21/10/2021
Τable of PV Capacity for the Non- Interconnected Islands (August 2021) -
21/10/2021
Licensing progress data for Solar Thermal Stations in NII (August 2021) -
21/10/2021
Licensing progress data for Hybrid Plants in NII (August 2021) -
21/10/2021
Licensing progress data for Cogeneration of Heat-High Performance in NII (August 2021) -
21/10/2021
Records of requests for Biomass, biogas or bioliquid in NII (August 2021) -
21/10/2021
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (August 2021) -
21/10/2021
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (August 2021) -
21/10/2021
File with Applications for Wind Farms at the Non-Interconnected Islands (August 2021) -
21/10/2021
Applications record for small Wind Farms at NIIs (August 2021) -
20/07/2021
Τable of PV Capacity for the Non- Interconnected Islands (June 2021) -
20/07/2021
Licensing progress data for Solar Thermal Stations in NII (June 2021) -
20/07/2021
Licensing progress data for Hybrid Plants in NII (June 2021) -
20/07/2021
Licensing progress data for Cogeneration of Heat-High Performance in NII (June 2021) -
20/07/2021
Records of requests for Biomass, biogas or bioliquid in NII (June 2021) -
20/07/2021
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (June 2021) -
20/07/2021
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2021) -
20/07/2021
File with Applications for Wind Farms at the Non-Interconnected Islands (June 2021) -
20/07/2021
Applications record for small Wind Farms at NIIs (June 2021) -
19/03/2021
Τable of PV Capacity for the Non- Interconnected Islands (February 2021) -
19/03/2021
Licensing progress data for Solar Thermal Stations in NII (February 2021) -
19/03/2021
Licensing progress data for Hybrid Plants in NII (February 2021) -
19/03/2021
Licensing progress data for Cogeneration of Heat-High Performance in NII (February 2021) -
19/03/2021
Records of requests for Biomass, biogas or bioliquid in NII (February 2021) -
19/03/2021
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (February 2021) -
19/03/2021
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (February 2021) -
19/03/2021
File with Applications for Wind Farms at the Non-Interconnected Islands (February 2021) -
19/03/2021
Applications record for small Wind Farms at NIIs (February 2021) -
20/01/2021
Τable of PV Capacity for the Non- Interconnected Islands (December 2020) -
20/01/2021
Licensing progress data for Solar Thermal Stations in NII (December 2020) -
20/01/2021
Applications record for small Wind Farms at NIIs (December 2020) -
20/01/2021
Licensing progress data for Hybrid Plants in NII (December 2020) -
20/01/2021
Licensing progress data for Cogeneration of Heat-High Performance in NII (December 2020) -
20/01/2021
Records of requests for Biomass, biogas or bioliquid in NII (December 2020) -
20/01/2021
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (December 2020) -
20/01/2021
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (December 2020) -
20/01/2021
File with Applications for Wind Farms at the Non-Interconnected Islands (December 2020) -
13/11/2020
Τable of PV Capacity for the Non- Interconnected Islands (October 2020) -
13/11/2020
Licensing progress data for Solar Thermal Stations in NII (October 2020) -
13/11/2020
Licensing progress data for Hybrid Plants in NII (October 2020) -
13/11/2020
Licensing progress data for Cogeneration of Heat-High Performance in NII (October 2020) -
13/11/2020
Records of requests for Biomass, biogas or bioliquid in NII (October 2020) -
13/11/2020
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (October 2020) -
13/11/2020
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (October 2020) -
13/11/2020
File with Applications for Wind Farms at the Non-Interconnected Islands (October 2020) -
16/09/2020
Τable of PV Capacity for the Non- Interconnected Islands (August 2020) -
16/09/2020
Licensing progress data for Solar Thermal Stations in NII (August 2020) -
16/09/2020
Licensing progress data for Hybrid Plants in NII (August 2020) -
16/09/2020
Licensing progress data for Cogeneration of Heat-High Performance in NII (August 2020) -
16/09/2020
Records of requests for Biomass, biogas or bioliquid in NII (August 2020) -
16/09/2020
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (August 2020) -
16/09/2020
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (August 2020) -
16/09/2020
File with Applications for Wind Farms at the Non-Interconnected Islands (August 2020) -
10/07/2020
Τable of PV Capacity for the Non- Interconnected Islands (June 2020) -
10/07/2020
Licensing progress data for Solar Thermal Stations in NII (June 2020) -
10/07/2020
Licensing progress data for Hybrid Plants in NII (June 2020) -
10/07/2020
Licensing progress data for Cogeneration of Heat-High Performance in NII (June 2020) -
10/07/2020
Records of requests for Biomass, biogas or bioliquid in NII (June 2020) -
10/07/2020
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (June 2020) -
10/07/2020
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2020) -
10/07/2020
File with Applications for Wind Farms at the Non-Interconnected Islands (June 2020) -
22/05/2020
Τable of PV Capacity for the Non- Interconnected Islands (March 2020) -
22/05/2020
Licensing progress data for Solar Thermal Stations in NII (April 2020) -
22/05/2020
Licensing progress data for Hybrid Plants in NII (April 2020) -
22/05/2020
Licensing progress data for Cogeneration of Heat-High Performance in NII (April 2020) -
22/05/2020
Records of requests for Biomass, biogas or bioliquid in NII (March 2020) -
22/05/2020
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (March 2020) -
22/05/2020
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (March 2020) -
22/05/2020
File with Applications for Wind Farms at the Non-Interconnected Islands (March 2020) -
07/02/2020
Τable of PV Capacity for the Non- Interconnected Islands (December 2019) -
07/02/2020
Licensing progress data for Solar Thermal Stations in NII (December 2019) -
07/02/2020
Licensing progress data for Hybrid Plants in NII (December 2019) -
07/02/2020
Licensing progress data for Cogeneration of Heat-High Performance in NII (December 2019) -
07/02/2020
Records of requests for Biomass, biogas or bioliquid in NII (December 2019) -
07/02/2020
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (December 2019) -
07/02/2020
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (December 2019) -
07/02/2020
File with Applications for Wind Farms at the Non-Interconnected Islands (December 2019) -
07/11/2019
Τable of PV Capacity for the Non- Interconnected Islands (September 2019) -
07/11/2019
Licensing progress data for Solar Thermal Stations in NII (September 2019) -
07/11/2019
Licensing progress data for Hybrid Plants in NII (September 2019) -
07/11/2019
Licensing progress data for Cogeneration of Heat-High Performance in NII (September 2019) -
07/11/2019
Records of requests for Biomass, biogas or bioliquid in NII (September 2019) -
07/11/2019
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (September 2019) -
07/11/2019
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (September 2019) -
07/11/2019
File with Applications for Wind Farms at the Non-Interconnected Islands (September 2019) -
19/07/2019
File with Applications for Wind Farms at the Non-Interconnected Islands (June 2019) -
19/07/2019
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2019) -
19/07/2019
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (June 2019) -
19/07/2019
Records of requests for Biomass, biogas or bioliquid in NII (June 2019) -
19/07/2019
Licensing progress data for Hybrid Plants in NII (June 2019) -
19/07/2019
Licensing progress data for Solar Thermal Stations in NII (June 2019) -
19/07/2019
Τable of PV Capacity for the Non- Interconnected Islands (June 2019) -
01/03/2019
Τable of PV Capacity for the Non- Interconnected Islands (January 2019) -
01/03/2019
Licensing progress data for Solar Thermal Stations in NII (February 2019) -
01/03/2019
Licensing progress data for Hybrid Plants in NII (February 2019) -
01/03/2019
Records of requests for Biomass, biogas or bioliquid in NII (January 2019) -
01/03/2019
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (January 2019) -
01/03/2019
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (January 2019) -
01/03/2019
File with Applications for Wind Farms at the Non-Interconnected Islands (January 2019) -
16/10/2018
Τable of PV Capacity for the Non- Interconnected Islands (September 2018) -
16/10/2018
Licensing progress data for Solar Thermal Stations in NII (September 2018) -
16/10/2018
Licensing progress data for Hybrid Plants in NII (September 2018) -
16/10/2018
Records of requests for Biomass, biogas or bioliquid in NII (September 2018) -
16/10/2018
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (September 2018) -
16/10/2018
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (September 2018) -
16/10/2018
File with Applications for Wind Farms at the Non-Interconnected Islands (September 2018) -
20/07/2018
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2018) -
20/07/2018
Licensing progress data for PV Stations in NII (June 2018) -
20/07/2018
Records of requests for Biomass, biogas or bioliquid in NII (June 2018) -
20/07/2018
Licensing progress data for Hybrid Plants in NII (June 2018) -
20/07/2018
Licensing progress data for Solar Thermal Stations in NII (June 2018) -
20/07/2018
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (June 2018) -
20/07/2018
File with Applications for Wind Farms at the Non-Interconnected Islands (June 2018) -
15/05/2018
Licensing progress data for PV Stations in NII (March 2018) -
15/05/2018
Licensing progress data for Solar Thermal Stations in NII (March 2018) -
15/05/2018
Licensing progress data for Hybrid Plants in NII (March 2018) -
15/05/2018
Records of requests for Biomass, biogas or bioliquid in NII (March 2018) -
15/05/2018
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (March 2018) -
15/05/2018
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (March 2018) -
15/05/2018
File with Applications for Wind Farms at the Non-Interconnected Islands (March 2018) -
06/02/2018
Licensing progress data for PV Stations in NII (December 2017) -
06/02/2018
Licensing progress data for Solar Thermal Stations in NII (December 2017) -
06/02/2018
Licensing progress data for Hybrid Plants in NII (December 2017) -
06/02/2018
Records of requests for Biomass, biogas or bioliquid in NII (December 2017) -
06/02/2018
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (December 2017) -
06/02/2018
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (December 2017) -
06/02/2018
File with Applications for Wind Farms at the Non-Interconnected Islands (December 2017) -
24/10/2017
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (September 2017) -
24/10/2017
Licensing progress data for PV Stations in NII (September 2017) -
24/10/2017
Licensing progress data for Solar Thermal Stations in NII (September 2017) -
24/10/2017
Licensing progress data for Hybrid Plants in NII (September 2017) -
24/10/2017
Records of requests for Biomass, biogas or bioliquid in NII (September 2017) -
24/10/2017
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (September 2017) -
17/07/2017
Licensing progress data for PV Stations in NII (June 2017) -
17/07/2017
Licensing progress data for Solar Thermal Stations in NII (June 2017) -
17/07/2017
Licensing progress data for Hybrid Plants in NII (June 2017) -
17/07/2017
Records of requests for Biomass, biogas or bioliquid in NII (June 2017) -
17/07/2017
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (June 2017) -
17/07/2017
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (June 2017) -
05/04/2017
Licensing progress data for PV Stations in NII (March 2017) -
05/04/2017
Licensing progress data for Solar Thermal Stations in NII (March 2017) -
05/04/2017
Licensing progress data for Hybrid Plants in NII (March 2017) -
05/04/2017
Records of requests for Biomass, biogas or bioliquid in NII (March 2017) -
05/04/2017
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (March 2017) -
05/04/2017
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (March 2017) -
16/01/2017
Licensing progress data for PV Stations in NII (December 2016) -
16/01/2017
Licensing progress data for Solar Thermal Stations in NII (December 2016) -
16/01/2017
Licensing progress data for Hybrid Plants in NII (December 2016) -
16/01/2017
Records of requests for Biomass, biogas or bioliquid in NII (December 2016) -
16/01/2017
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (December 2016) -
16/01/2017
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (December 2016) -
25/07/2016
Licensing progress data for PV stations – Roof PV – PV Net Metering in NII (July 2016) -
19/07/2016
Records of requests for PV Stations, PV Special Program and PV net Metering in NII (July 2016) -
19/07/2016
Licensing progress data for PV Stations in NII (July 2016) -
19/07/2016
Licensing progress data for Solar Thermal Stations in NII (July 2016) -
19/07/2016
Licensing progress data for Hybrid Plants in NII (July 2016) -
19/07/2016
Records of requests for Biomass, biogas or bioliquid in NII (July 2016) -
13/04/2016
Updated Table for PV stations and PV Special Program in Crete (April 2016) -
13/04/2016
Pending requests for PV Special program in Crete records (April 2016) -
13/04/2016
Pending requests for PVs Net Metering in Crete records (April 2016) -
08/05/2015
Requests for PV stations and PV Special program in Non-Interconnected Islands records (April 2015) -
07/05/2015
Licensing progress data for PV Stations in NII (April 2015)